Sunday, June 14, 2026 · Lagos

The NEWS

Defining The Present, Shaping The Future

Defining The Present, Shaping The FutureSUBSCRIBE ₦1,000/MO

Lagos agency pulls down 4 two-storey buildings in Ikoyi

Enjoying this story? Read the full magazine — archive back to 1993.

The 4 two-storey buildings pulled down by LASEMA for failing integrity test

The Lagos State Emergency Management Agency (LASEMA) on Saturday pulled down four  buildings under construction at Glover  Court, Ikoyi, the same compound where a building collapsed on Friday.

LASEMA Director-General, Dr Olufemi Oke-Osanyintolu, said the building were pulled down for failing integrity test, the News Agency of Nigeria (NAN) reports.
According to him, the test was conducted following rescue of four persons and recovery of one body in the collapsed building  at  4:10p.m on Friday,
“The test was conducted by Solid Material Testing Agency, Lagos State Building Control Agency and  the Ministry of Physical Planning,” he said.
“The decision to pull down the buildings is to avert further loss of lives and property.
“The operation is now completed,” Oke-Osanyintolu said.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.