Personnel of General Electric Grid Solutions working on the construction site of the 240MW Afam III Fast Power Plant at the Afam Power Plc . INSET: Fashola, Obademi (left), TheophilIus and others during the inspection tour
Most Read
-
Democracy Day: Let Us Protect Our Hard-Earned Freedom, Support Tinubu’s Reforms—Yilwatda
-
Tinubu Defends Economic Reforms, Says Nigeria Moving from Uncertainty to Stability
-
Leaked Video: The many sides to a randy Enugu bishop
-
Liberia to Host Africa’s First Ever Youth Conference, July 1 to 5, 2026
-
FCMB Appoints Bismarck Rewane as Non-Executive Director and Chairman of its Board of Directors





Leave a Reply